Bridge Dalux and Autodesk Construction Cloud (Forma) without switching anyone's workflow. DMS Sync Manager keeps drawings, BIM models, and metadata aligned between the two platforms so design teams in ACC and site teams in Dalux stay on the same set of files.
Three steps to keep Dalux and Autodesk Construction Cloud in sync.
Dalux uses an API key; Autodesk Construction Cloud uses OAuth. Both connections are project-scoped and stored encrypted.
Map one or more Dalux document areas to ACC project folders. Direction is per task — Dalux → ACC, ACC → Dalux, or both as parallel tasks.
Filter by file type, revision, label, or last-modified. Schedule by hour, day, or on demand. Every file move shows up in the full activity log.
A few real-world scenarios.
"Projects rarely fail in design — they fail when teams can't trust they're looking at the latest version."
Each sync task is one-way to keep version conflicts impossible. Run two tasks in parallel for two-way behaviour, with a rule that prevents loops.
Yes. Models are treated as files like any other; metadata mapping is configurable per project.
DMS Sync uses the Autodesk Forge / Construction Cloud APIs. Standard Autodesk API throttling applies; we batch and back off automatically.
Yes. Each sync task targets a specific folder. Multiple tasks can run in parallel for different folders or projects.
Book a demo and we'll walk you through setting it up for your project.